I have received an update from the Project Vista construction team advising that basement concrete finishing works may need to continue until 10pm.
The team says the concrete has reached its initial setting stage and requires a finishing process called “pan floating”. They explain that this must take place while the concrete is curing and cannot be postponed without affecting the required surface finish.
According to the contractor, the work involves electrically powered equipment operated by a small team at the bottom of the basement, with site management supervising. They describe it as a low-noise operation and expect disturbance to be minimal, citing their experience of similar previous works.
I appreciate that works continuing into the evening can concern nearby residents. The contractor has apologised for any inconvenience and says the operation will be completed as quickly as possible, by 10pm at the latest.
If you experience noise or disturbance associated with these works, please let me know, including the time and nature of the problem, so I can raise it with the project team.